Apartment Finishing in New Cairo
Most apartments in New Cairo are handed over semi-finished or as bare brick, so the first decisions on layout, electrical and air conditioning shape both the final result and the cost.
Tashteeb Design handles design and execution together, starting from the apartment as you received it and ending with a home ready to live in, with one party responsible for every item.
What is different about New Cairo apartments?
Compound management rules
Many compounds require a work permit and drawings before starting, and set hours for work, materials and crews. These are reviewed before the schedule is set so execution does not stall.
Checking the handover state
Handover condition varies between developers, even within a single phase. Knowing what was actually done and what must be redone, such as electrical and plumbing rough-ins, avoids paying for an item twice.
Air conditioning before ceilings
Choosing concealed or central air conditioning sets the gypsum ceiling heights and pipe routes, so it is decided at the design stage, not after the gypsum work begins.
Scope of work
- Space planning and 3D visualization before work starts
- Electrical, plumbing and air-conditioning works
- Plastering, flooring and wall finishes
- Gypsum ceilings and lighting
- Kitchens and bathrooms
Frequently asked questions
How much does it cost to finish an apartment in New Cairo?
It depends on the area, handover state, finishing level, number of bathrooms and air conditioning. The cost calculator on this site gives an estimated range, and the final price is set after inspecting the apartment.
Do you deal with compound management?
We review the compound requirements at the start of the project, prepare the drawings needed for the permit, and work within the set hours.
Estimate your cost · Request a consultation · Finishing by Area and Property Type